Lane closed, on HOLLAND TUNL WB at HOLLAND TUNL
As of January 3, 2010 the 2004 restriction that prohibited 2 axle and 3 axle single unit trucks from using the eastbound tunnel to New York was lifted. All 4, 5 axle and 6 axle trucks as well as all 3 axle dual unit trucks, trailers and towed vehicles remain restricted from using the tunnel in both directions. One of two lanes will be closed westbound to New Jersey Sunday nights to Friday mornings from 11:30pm to 5:30am, and 12:01am to 8am Saturday mornings. These lane closures are required to facilitate PANY amp;NJ construction activity and maintenance.
Report date:01/27/2006 14:10
End Date: 09/03/2010 10:23
Lane closed, on HOLLAND TUNL EB at HOLLAND TUNL
As of January 3, 2010 the 2004 restriction that prohibited 2 axle and 3 axle single unit trucks from using the eastbound tunnel to New York was lifted. All 4, 5 axle and 6 axle trucks as well as all 3 axle dual unit trucks, trailers and towed vehicles remain restricted from using the tunnel in both directions. One of two lanes will be closed westbound to New Jersey Sunday nights to Friday mornings from 11:30pm to 5:30am, and 12:01am to 8am Saturday mornings. These lane closures are required to facilitate PANY amp;NJ construction activity and maintenance.
Report date:01/27/2006 14:10
End Date: 09/03/2010 10:23
Closed, on BROOKLYN BRG EB at BROOKLYN BRG
This Bridge is closed to Manhattan bound traffic overnight as of Monday night August 23rd 2010 to perform necessary long term rehabilitation and repainting work. Brooklyn bound traffic will be maintained throughout the project as will the span s pedestrian and cycling path. Motorists should follow signed routes to access the bridge leaving Manhattan. The northbound FDR exit to the Brooklyn Bridge is closed starting 30 minutes before closure hours noted below. Motorists should use the prior South Street exit. All work will occur overnight during off peak hours, when Manhattan bound motorists will be detoured to the nearby Manhattan Bridge, or may choose other crossings. The full closure Manhattan bound westbound overnight closures will occur Sunday night through Friday morning between 11pm and 6am, Saturday 12:01am to 7am, and Sunday 12:01am to 9am. One of three lanes may be closed in eastbound direction to Brooklyn as needed 10am to 3pm weekdays.
Report date:12/30/2005 13:16
End Date: 09/03/2010 10:23
Lane closed, on MANHATTAN BRG EB at MANHATTAN BRG
There are five lanes from 6am to 10am Monday to Friday westbound Manhattan bound of which two are on the north upper roadway the left lane HOV2 and three on the lower roadway; two lanes are maintained on the south upper roadway eastbound Brooklyn bound . One lane on the lower roadway may be closed, as needed, 10am to 3pm Monday to Friday. No trucks are permitted on the North Upper westbound roadway from 5am to 3pm Monday to Friday. Overnight Monday to Friday from 3pm to 9pm there are five lanes eastbound and two lanes westbound. To facilitate traffic flow detoured from the Brooklyn Bridge there will be five lanes westbound to Manhattan, and two lanes eastbound to Brooklyn from 9pm to 10am Monday to Friday as well as the weekends from 9pm Friday to 10am Monday. The north bikeway is open, and the south walkway open at all times. Lane closures may occur on off peak hours weekdays for maintenance and construction activity for NYCDOT bridges on an as needed basis through June 2013.
Report date:09/28/2007 13:07
End Date: 09/03/2010 10:23
Closed, on BROOKLYN BRG WB at BROOKLYN BRG
This Bridge is closed to Manhattan bound traffic overnight as of Monday night August 23rd 2010 to perform necessary long term rehabilitation and repainting work. Brooklyn bound traffic will be maintained throughout the project as will the span s pedestrian and cycling path. Motorists should follow signed routes to access the bridge leaving Manhattan. The northbound FDR exit to the Brooklyn Bridge is closed starting 30 minutes before closure hours noted below. Motorists should use the prior South Street exit. All work will occur overnight during off peak hours, when Manhattan bound motorists will be detoured to the nearby Manhattan Bridge, or may choose other crossings. The full closure Manhattan bound westbound overnight closures will occur Sunday night through Friday morning between 11pm and 6am, Saturday 12:01am to 7am, and Sunday 12:01am to 9am. One of three lanes may be closed in eastbound direction to Brooklyn as needed 10am to 3pm weekdays.
Report date:03/19/2010 17:57
End Date: 09/03/2010 10:23
Lane closed, on MANHATTAN BRG WB at MANHATTAN BRG
There are five lanes from 6am to 10am Monday to Friday westbound Manhattan bound of which two are on the north upper roadway the left lane HOV2 and three on the lower roadway; two lanes are maintained on the south upper roadway eastbound Brooklyn bound . One lane on the lower roadway may be closed, as needed, 10am to 3pm Monday to Friday. No trucks are permitted on the North Upper westbound roadway from 5am to 3pm Monday to Friday. Overnight Monday to Friday from 3pm to 9pm there are five lanes eastbound and two lanes westbound. To facilitate traffic flow detoured from the Brooklyn Bridge there will be five lanes westbound to Manhattan, and two lanes eastbound to Brooklyn from 9pm to 10am Monday to Friday as well as the weekends from 9pm Friday to 10am Monday. The north bikeway is open, and the south walkway open at all times. Lane closures may occur on off peak hours weekdays for maintenance and construction activity for NYCDOT bridges on an as needed basis through June 2013.
Report date:10/19/2007 14:05
End Date: 09/03/2010 10:23
Bridge maintenance operations, on WILLIAMSBURG BRG EB at WILLIAMSBURG BRG
There are four lanes westbound Manhattan bound and two lanes eastbound Brooklyn bound with two lanes closed for construction in the off peak direction weekdays from 6am to 10am. Weekdays from 10am to 3pm there are three lanes maintained inbound, and two lanes maintained for traffic outbound with three lanes closed for construction activity. There are four lanes eastbound and four lanes westbound all other times. These off peak hour lane closures are required as needed to facilitate NYCDOT bridge maintenance and rehabilitation work through December 2010. Truck traffic is allowed on the bridge in both directions on the outer roadways only. Pedestrian and bicycle access maintained at all times.
Report date:12/30/2005 13:16
End Date: 09/03/2010 10:23
Road construction, on E 13TH ST at AVENUE D
This street was converted to a two way dead end street as of March 19, 2005 related to NYCDEP s pumping station project through summer 2010.
Report date:08/24/2007 17:46
End Date: 09/03/2010 10:23
Road construction, on E 12TH ST at AVENUE D
East 12th Street was converted March 19, 2005 to one way westbound, and Szold Place to one way southbound to assist with NYCDEP s pumping station project through summer 2010.
Report date:08/24/2007 17:46
End Date: 09/03/2010 10:23
Closed, on 5TH AVE at FLATBUSH AVE
SCHEDULED WORK CREW; ROAD CLOSED; FOR OF THE NETS NEW ARENA.ALSO CLOSED PERMANENTLY PACIFIC ST FROM 5TH AVE TO 6TH AVE, PACIFIC ST FROM VANDERBILT AVE TO CARLTON AVE .6TH AVE FROM FLATBUSH AVE TO PACIFIC AVE WILL BECOME TWO WAY PACIFIC AVE FROM CARLTON AVE TO 6TH AVE WILL BE ONE WAY; SEEK ALTERNATE.
Report date:03/14/2010 08:46
End Date: 03/14/2012 23:58
Road construction, on SZOLD PL at E 12TH ST
East 12th Street was converted March 19, 2005 to one way westbound, and Szold Place to one way southbound to assist with NYCDEP s pumping station project through summer 2010.
Report date:08/24/2007 17:46
End Date: 09/03/2010 10:23
On ramp closed, on FDR DR NB at HOUSTON ST
ON RAMP CLOSED; WITH EMERGENCY CONSTRUCTION UFN, ALSO AT 15TH ST EMERGENCY RIGHT LANE CONSTRUCTION UFN.
Report date:09/21/2009 06:13
End Date: 11/26/2010 22:58
Closed, on AVENUE D at E 12TH ST
This roadway was closed as of March 19, 2005, to facilitate NYCDEP pumping station capital project through summer 2010.
Report date:08/24/2007 17:46
End Date: 09/03/2010 10:23
Closed, on CARLTON AVE BRG at PACIFIC ST
This bridge was closed January 23, 2008. Motorists and bicyclist should use alternate route or follow posted detour. Pedestrians must use the adjacent 6th Avenue Bridge, or Vanderbilt Avenue. This is a long term project to upgrade the LIRR yard and construct a new bridge. This work is being performed by a private developer contractor and estimated for completion April 2012.
Report date:01/04/2008 13:20
End Date: 09/03/2010 10:23
Bridge maintenance operations, on WILLIAMSBURG BRG WB at WILLIAMSBURG BRG
There are four lanes westbound Manhattan bound and two lanes eastbound Brooklyn bound with two lanes closed for construction in the off peak direction weekdays from 6am to 10am. Weekdays from 10am to 3pm there are three lanes maintained inbound, and two lanes maintained for traffic outbound with three lanes closed for construction activity. There are four lanes eastbound and four lanes westbound all other times. These off peak hour lane closures are required as needed to facilitate NYCDOT bridge maintenance and rehabilitation work through December 2010. Truck traffic is allowed on the bridge in both directions on the outer roadways only. Pedestrian and bicycle access maintained at all times.
Report date:12/30/2005 13:16
End Date: 09/03/2010 10:23
Road construction, on QUEENSBORO BRG NB at QUEENSBORO BRG
The North Inner Lower Roadway is Manhattan bound with access from Queens Plaza North to Second Avenue and East 60th Street. The South Inner Lower roadway is Queens bound with access from 2nd Avenue to Queens Plaza South. Trucks are allowed on the lower inner roadways only. Trucks are prohibited from the upper and outer roadways. The North Upper Roadway is Manhattan bound at all times. Access is to East 62nd Street East 63rd Street in Manhattan from Thomson Avenue, 21st Street at Queens Plaza North, and 11th Street at Queens Plaza South in Queens. The South Upper Roadway is Queens bound except from 5:30 am to 11am weekdays when the roadway is reversed and accommodates the Manhattan bound high occupancy vehicle HOV lane Manhattan bound high occupancy vehicle HOV lane containing two or more people from 6am to 9:30am, Monday to Friday. Access is to East 58th Street East 57th Street in Manhattan from Thomson Avenue or 21st Street at 43rd Avenue in Queens.
Report date:08/22/2007 11:46
End Date: 09/03/2010 10:23





New York area traffic